Project Specific Solutions

  • Site specific equipment adaption
    In some cases the standard proprietary equipment supplied by TSNZ may require the addition of other shoring elements to enable clear space or access. TSNZ offers advice in this area and has experience of a range of unusual installations which can be drawn upon to provide solutions.
  • Temporary works designs
    Increasingly, temporary works designs (TWDs) are becoming a requirement for excavations. Such designs can be time consuming and costly. TSNZ can provide TWDs for most applications, even for geometrically or geotechnically complex excavations.
  • Single sided propping
    With the MGF range of hydraulic shoring, TSNZ stocks the swivels and attachment plates as well as the props/struts to enable single sided propping of existing structures or shoring for retaining wall construction or similar.
  • In situ formwork/shuttering
    The slide rails systems offered by TSNZ are specifically designed so that the internal faces have all components flush with each other. This is to enable the internal faces of the shoring to be used as formwork, subsequently saving costs for over excavation and form work construction time and material costs.

 

Follow Us on Facebook

News

  • New "Multibox" is available now

    TSNZ launches a new slide rail manhole box variant. Available in NZ now, the new Multibox...

Updates

  • Did you know that there are regulations that apply to excavations over 1.5m deep
    Are you at risk of breaching them?

    We can help!