Hire (and Sales)
Ph 0800 746 7369
Home
Trench Boxes
Manhole Boxes
Double Slide Rail System
Sheet Pile Frame System
Corner Slide Rail System
Distributors
Technical Support
Projects
Safety
About
Contact Us
 
 
 
 
News  
 
Dated: April 2010 Display all News Items
 
NEW EGVP Single Slide Rail
 

Due mid June in New Zealand the EGVP Single Slide Rail sytem will enable rapid, safe shoring for large diameter pipes to a depth of 4m. The EGVP uses the same KR 4m long shoring panels that TSNZ's current Double Slide Rail system uses. As well TSNZ has ordered some 3m panels to give more flexibility. The 3m panels can be used instaed of or in combination with 4m panels. Like the DGVP Double Slide Rail system, the EGVP Single Slide Rail system has a sliding transverse beam assembly which can be configured to any width required and can be raised to give very high pipe clearances. This system will be ideal for laying pipes up to 2.5m diameter.

 
Rss Feed
Projects
 
Victoria Park Tunnel - Deep Stormwater Diversion
 
109 concrete box culvert sections 4.1m wide x 2.6m high at depths up to 6m are being laid to divert the Freeman's Bay SW culvert away from the line of the new Tunnel.
 
Click here to read on
 
 
 
Deep Pit Shoring at Huntly Power Station
 
When one of the 2.4m diameter cooling water intake pipes at Huntly Power Station started to leak, efficient and safe shoring was required in a hurry.
 
Click here to read on
 
 
 
Updates
 
Did you know that there are regulations that apply to excavations over 1.5m deep?
 
Are you at risk of breaching them?
 
We can help
 
 
 
Require a demo DVD?
 
Request a demo DVD